What was found
DURING CLIMBOUT, NR 1 ENG STARTED VIBRATING THEN HAD A FIRE WARNING. FOLLOWED PROCEDURES, DUMPED FUEL, RETURNED TO CDB. INSP INLET COMPRESSOR AND TURBINE AREA, CHECKED ENG MOUNTS AND CONTROLS CHECKED PNEUMATIC DUCTING, BLEED AIR MUSCLE LINE CRACKED (CAPPED & LEAK CHECKED) OK. PRECAUTIONARY RELOCATION OF A/C FROM CDB TO ANC MAINT BASE.