What was found
DURING SCHEDULED C-CHECK, FOUND FLOOR SUPPORT CHANNEL CRACKED AT FORWARD ATTACH HOLE AND FLOORBEAM ATTACH HOLE ELONGATED AT BS 328 RBL 44. REMOVED FLOOR SUPPORT CHANNEL, FABRICATED NEW CHANNEL 7075T6 .094 IAW 51-10-02. TREATED AND PRIMED IAW 51-10-06. INSTALLED CHANNEL IAW SRM 51-30-02.