What was found
DURING SCHEDULED NR 1 CHECK, FOUND TRANSVERSE FLOORBEAM CORRODED AT FUS/STA 502 BBL 0 TO LBL 25. REPAIRED AS PER SRM 53-2-4, M-54 NR 129.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED NR 1 CHECK, FOUND TRANSVERSE FLOORBEAM CORRODED AT FUS/STA 502 BBL 0 TO LBL 25. REPAIRED AS PER SRM 53-2-4, M-54 NR 129.