What was found
DURING SCEDULED NR 1 CHECK, FOUND CORROSION ON TRANSVERSE FLOORBEAM UPPER AT FS 371 LBL 20-54. REPLACED FLOORBEAM AS PER SRM 51-2-1, M-54 NR 225.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCEDULED NR 1 CHECK, FOUND CORROSION ON TRANSVERSE FLOORBEAM UPPER AT FS 371 LBL 20-54. REPLACED FLOORBEAM AS PER SRM 51-2-1, M-54 NR 225.