What was found
DURING SCHEDULED NR 1 CHECK, FOUND CIRCUMFERENTIAL FRAME CRACKED AT FS 673 AT FLOORBEAM FLANGE RBL 60. REPLACED FRAME SECTION AT FACTORY SPLICE AS PER SRM 51-2-1 AND 51-2-12 M-54 NR 241.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED NR 1 CHECK, FOUND CIRCUMFERENTIAL FRAME CRACKED AT FS 673 AT FLOORBEAM FLANGE RBL 60. REPLACED FRAME SECTION AT FACTORY SPLICE AS PER SRM 51-2-1 AND 51-2-12 M-54 NR 241.