What was found
DURING SCHEDULED INSPECTION OF THE PRESS FLOOR IN THE LEFT WHEEL WELL PER AD 92-19-11, FOUND THE FOLLOWING 5 CRACKS AT STATION 940, BL 29-1 .375 INCH, BL 31 .625 INCH, BL 36 .375 INCH, BL 38 .75 INCH AND BL 55 1.125 INCH. REPAIRED PER SB 53-0149 RV AND DWG 65-89360. (M)