What was found
POST FLIGHT, THE CREW REPORTED THAT THE MAIN CABIN DOOR WAS DIFFICULT TO OPEN. MAINTENANCE CLEANED AND LUBED THE MAIN DOOR OPERATING MECHANISM IAW AMM PROCEDURES. OPS CHECKED GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
POST FLIGHT, THE CREW REPORTED THAT THE MAIN CABIN DOOR WAS DIFFICULT TO OPEN. MAINTENANCE CLEANED AND LUBED THE MAIN DOOR OPERATING MECHANISM IAW AMM PROCEDURES. OPS CHECKED GOOD.