What was found
CREW REPORTED THE MAIN PITCH TRIM TO BE INOPERATIVE DURING CRUISE FLIGHT. MAINTENANCE REMOVED AND REPLACED THE HORIZONTAL STAB CONTROL UNIT IAW AMM PROCEDURES. PITCH TRIM OPERATIONALLY CHECKED GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CREW REPORTED THE MAIN PITCH TRIM TO BE INOPERATIVE DURING CRUISE FLIGHT. MAINTENANCE REMOVED AND REPLACED THE HORIZONTAL STAB CONTROL UNIT IAW AMM PROCEDURES. PITCH TRIM OPERATIONALLY CHECKED GOOD.