Service difficulty report · Switch · Emb EMB145EP

Difficulty date
May 6, 2013
Submitted
May 8, 2013
Operation
Air carrier
Aircraft
N805HK
Make and model
Emb EMB145EP
Aircraft serial
145096
Aircraft time
30,889 hours, 28,560 cycles
Part
Switch
Condition
Failed
Location
Ac Bay
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CRUISE FLIGHT THE FLIGHT CREW GOT AN INDICATION THAT THE NR 1 PAC OVERLOAD AND IN MANUAL THE SYSTEM WENT TO OVERHEAT. AIRCRAFT RETURNED TO PIT. MAINTENANCE INSPECTED AND FOUND THE OVERTEMP SWITCH BAD. THE NR 1 PACK WAS DEFERRED PER MEL 21-51-00-1-1.

More about the Emb EMB-145EP