What was found
MAIN CABIN RH FLOOR SILL HAS CORROSION AT FRAME 48 & 49- REMOVED RH FLOOR SILL AT FRAME 48-49. PICKED UP NEW HOLES AND STARTED INSTALLING NEW FLOOR SILL AT FRAME 48-49. FINISHED INSTALLATION OF RH FLOOR SILL AT FRAME 48-49.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CABIN RH FLOOR SILL HAS CORROSION AT FRAME 48 & 49- REMOVED RH FLOOR SILL AT FRAME 48-49. PICKED UP NEW HOLES AND STARTED INSTALLING NEW FLOOR SILL AT FRAME 48-49. FINISHED INSTALLATION OF RH FLOOR SILL AT FRAME 48-49.