What was found
MAIN CABIN LH FLOOR SILL HAS CORROSION FROM FR 26 THRU 29 - REMOVED MAIN CABIN LH FLOOR SILL FR 26-29, STARTED LOCATING FASTENER HOLES. COMPLETED INSTALL OF NEW FLOOR SILL IN MAIN CABIN FROM FR 26-29.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CABIN LH FLOOR SILL HAS CORROSION FROM FR 26 THRU 29 - REMOVED MAIN CABIN LH FLOOR SILL FR 26-29, STARTED LOCATING FASTENER HOLES. COMPLETED INSTALL OF NEW FLOOR SILL IN MAIN CABIN FROM FR 26-29.