Service difficulty report · Throttle Cable · Cndair CL6002B19

Difficulty date
December 10, 2011
Submitted
December 13, 2011
Operation
Air carrier
Aircraft
N8775A
Make and model
Cndair CL6002B19
Aircraft serial
7775
Aircraft time
20,012 hours, 17,517 cycles
System (JASC)
7603 · Power Lever
Part
Throttle Cable
Condition
Binding
Location
Rt Engine
Stage of operation
TX
How discovered
O
Nature of condition
R
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING ENGINE START, 2 APPEARED TO BE A HUNG START 2 DID START BUT WHEN ADVANCING THE THRUST LEVER, THERE SEEMS TO BE BINDING AND POSSIBLY SOMETHING RESTRICTING EITHER LEVER ADVANCEMENT OR SPOOL OF ENGINE. C/W FIM 76-11-00 FIGURE 101 AND FOUND RT AFT THROTTLE CABLE FAILED FUNCTION TEST. FOUND RT AFT THROTTLE CONTROL CABLE AND RT ENGINE THROTTLE CONTROL CABLE BINDING. REMOVED AND REPLACED RT AFT THROTTLE CONTROL CABLE IAW AMM 76-11-07 AND REMOVED AND REPLACED RT ENGINE THROTTLE CONTROL CABLE FROM GEARBOX IAW AMM 76-11-09. REMOVED AND REPLACED SHUTOFF VALVE, GEARBOX, THROTTLE CABLE AND RED HARNESS ON RT SIDE. REFERENCE NON-ROUTINE CARD #13548. CHECKED RT ENGINE THROTTLE CABLE RIG IAW AMM 76-11-00. CHECKS NORMAL. PERFORMED OPS CHECK OF RT ENGINE THROTTLE CABLES IAW AMM 76-11-00.