What was found
FS 348 FRAME INTERCOSTAL UPPER FLANGE CORRODED. MATERIAL LOSS AFTER BLENDOUT IS .034". REPAIRED IAW EA CRJ253-01529 AND ASSOCIATED 8110-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FS 348 FRAME INTERCOSTAL UPPER FLANGE CORRODED. MATERIAL LOSS AFTER BLENDOUT IS .034". REPAIRED IAW EA CRJ253-01529 AND ASSOCIATED 8110-3.