Service difficulty report · Pump · Cndair CL6002D24

Difficulty date
July 14, 2015
Submitted
July 17, 2015
Operation
Air carrier
Aircraft
N925XJ
Make and model
Cndair CL6002D24
Aircraft serial
15183
Aircraft time
17,744 hours, 11,347 cycles
Part
Pump
Condition
Faulty
Location
Hydraulic Sys
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AT CRUISE ALTITUDE JUST PRIOR TO TOD HYD 3 LO PRESS CAUTION MSG DISPLAYED. ASSOCIATED INBD GND SPLRS MSG DISPLAYED. RAN POM PROCEDURE, UNABLE TO ESTABLISH SYS 3 PRESS. PERFORMED ALTERNATE LG EXTENSION. REF PILOT WRITE UP AML PG 3197921-1 3A CB POPPED IN FLIGHT. R & R 3B HYD PUMP PRESS SWITCH IAW AMM 29-34-01, PN OFF & ON 967008-1, SN OFF 5004, SN ON HYD 9724. OPERATIONS CHECKED GOOD. R & R 3A HYD PUMP IAW AMM 29-12-03, PN OFF & ON 66195-01, SN OFF K1925, SN ON K2959. OPERATIONS CHECKED FAILED. REF AML PG 3197923-1 FOR EL OF 3A HYD PUMP. IN FLIGHT 3A HYD PUMP CB POPPED IN AVIONICS BAY. RESET ALT EXTENSION HANDLE IAW 05-51-31. DEFER 3A HYD PUMP IAW MEL 29-12-1, PLACARD INSTALLED & MM02 UPDATED. REF DISC NR 2 FOR CAT II DEFERRAL. EMER WAS DECLARED.