What was found
BATHTUB FITTING IS CRACKED ON THE O/B SIDE OF RBL 9 AT FS 461, IN THE CABIN BELOW THE FLOOR. REMOVED CRACKED BRACKET IAW SRM 51-42-06 INSTALLED NEW BRACKET AFTER LOCATING/DRILLING IAW SRM 51-42-21.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BATHTUB FITTING IS CRACKED ON THE O/B SIDE OF RBL 9 AT FS 461, IN THE CABIN BELOW THE FLOOR. REMOVED CRACKED BRACKET IAW SRM 51-42-06 INSTALLED NEW BRACKET AFTER LOCATING/DRILLING IAW SRM 51-42-21.