What was found
CORROSION ON MID/AFT PRESSURE SILL AND SILL-SPLICE, WINGBOX, LT SIDE, IN STA FS= 792 TO FS= 802 BETWEEN 36LBL TO 42LB L AT PAX CABIN. LEVEL CORROSION 1. CORROSION WAS REMOVED PER SRM 51-21-06-001-001-A01 AND FLAP PEEN WAS PERFORMED ON REPAIRED AREA PER SRM 51-24-11-001-001-A01 IN REFERENCE TO REO 690-53-41-171 REV-, STEP 3.