As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
INITIAL INSPECTION: CRACK IN CANISTER, WELDED NO.3 IN STA. WS148 AT RH MAIN FUEL TANK. (AD) SUMMARY: CANISTER NO.3 IN STA. WS148 AT RH MAIN FUEL TANK WITH TWO CRACKS OF 0.250", WAS REPAIRED PER REO.670-57-42-577 REV--. (ET) (HFEC) WAS ACCOMPLISHED ON EDGES OF TRIMMER AREA, NO CRACKS WERE FOUND PER CRJ 700/900/1000 NDTM PART06, 53-00-000-250-A01 (EQUIPMENT: PHASEC 3D C.N. 1381 DUE DATE: 31/DEC/19)