What was found
INITIAL INSPECTION: CRACK ON BOX [INTERNAL STRUCTURE] AT AC-EXTERNAL GROUND POWER SERVICE PANEL. BOX AT AC-EXTERNAL GROUND POWER SERVICE PANEL(122DR) WAS REPLACED PER CRJ-900 SRM 51-42-06-001-001-A01 AND SRM 51-42-20-001-001-A01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INITIAL INSPECTION: CRACK ON BOX [INTERNAL STRUCTURE] AT AC-EXTERNAL GROUND POWER SERVICE PANEL. BOX AT AC-EXTERNAL GROUND POWER SERVICE PANEL(122DR) WAS REPLACED PER CRJ-900 SRM 51-42-06-001-001-A01 AND SRM 51-42-20-001-001-A01.