What was found
INITIAL INSPECTION: CRACK IN RECEPTACLE PLATE AT FUSELAGE. (FUS) "SUMMARY: RECEPTACLE PLATE AT FUSELAGE WAS REPLACE PER CRJ/900 SRM 51-42-20-001-001-A01 PAR.6A "
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INITIAL INSPECTION: CRACK IN RECEPTACLE PLATE AT FUSELAGE. (FUS) "SUMMARY: RECEPTACLE PLATE AT FUSELAGE WAS REPLACE PER CRJ/900 SRM 51-42-20-001-001-A01 PAR.6A "