What was found
INITIAL INSPECTION: CRACK ON SUPPORT OF AC GROUND POWER CONNECTION RECEPTACLE. (FUS). RECEPTACLE SUPPORT WAS REPLACED PER CRJ/900 SRM 51-42-13-001-001-A01
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INITIAL INSPECTION: CRACK ON SUPPORT OF AC GROUND POWER CONNECTION RECEPTACLE. (FUS). RECEPTACLE SUPPORT WAS REPLACED PER CRJ/900 SRM 51-42-13-001-001-A01