What was found
"INITIAL INSPECTION: CRACK ON EGDE TO THE SUPPORT OF THE JUNCTION BOX 6 AT RH FWD EQUIPMENT (FUS) " "SUMMARY: ON NRC. 00156 SUPPORT OF THE JUNCTION BOX 6 AT RH FWD EQUIPMENT WAS REPLACED PER CRJ-900 SRM 51-42-06-001-001-A01 "
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
"INITIAL INSPECTION: CRACK ON EGDE TO THE SUPPORT OF THE JUNCTION BOX 6 AT RH FWD EQUIPMENT (FUS) " "SUMMARY: ON NRC. 00156 SUPPORT OF THE JUNCTION BOX 6 AT RH FWD EQUIPMENT WAS REPLACED PER CRJ-900 SRM 51-42-06-001-001-A01 "