What was found
R/H 9G BULKHEAD HAS 20EA AREAS OF DAMAGE AROUND POTTED INSERTS. REPAIRED RH 9G BULKHEAD IAW MHIRJ ENGINEERING ORDER CL-600-2B19-53-L06720 REV IR, DATED 4/15/2021.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R/H 9G BULKHEAD HAS 20EA AREAS OF DAMAGE AROUND POTTED INSERTS. REPAIRED RH 9G BULKHEAD IAW MHIRJ ENGINEERING ORDER CL-600-2B19-53-L06720 REV IR, DATED 4/15/2021.