What was found
FLOOR BEAM AT RBL 9 HAS MULTIPLE SPOTS OF CORROSION FROM F.S. 1000 TO F.S. 1070. C/A: PERFORMED SPLICE REPAIR TO FLOOR BEAM IAW CRJ 900 SRM 53-00-41-201-001-A03.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOOR BEAM AT RBL 9 HAS MULTIPLE SPOTS OF CORROSION FROM F.S. 1000 TO F.S. 1070. C/A: PERFORMED SPLICE REPAIR TO FLOOR BEAM IAW CRJ 900 SRM 53-00-41-201-001-A03.