As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING MAINTENANCE VISIT FOUND CORROSION DAMAGE TO NR 3 FLAP CANOE TRAILING EDGE TRACK BOLTS HOLES. DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REAMED HOLES TO REMOVE CORROSION, TREATED AREA IAW DC-8 SRM 51-1-8. INSTALLED TWO NAS4653151-7-27 BOLTS AND ASSOCIATED HARDWARE IAW FAA APPROVED DER ENGINEERING SKETCH EO 99-186 WITH APPROVED 8110-3 DATED 11/12/99. (CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM).