What was found
ON CLIMB AFTER CLIMB POWER WAS SET AND CLIMBING, NR 3 ENGINE SEIZED (1425Z). DID SHUT DOWN CHECK LIST. REMOVED AND REPLACED NR 3 ENGINE IAW MEO91 XXIII CFM56 POWER PLANT REMOVAL AND INSTALLATION CHECKLIST. OPS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ON CLIMB AFTER CLIMB POWER WAS SET AND CLIMBING, NR 3 ENGINE SEIZED (1425Z). DID SHUT DOWN CHECK LIST. REMOVED AND REPLACED NR 3 ENGINE IAW MEO91 XXIII CFM56 POWER PLANT REMOVAL AND INSTALLATION CHECKLIST. OPS CHECK GOOD.