What was found
DURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO LONGERON AT STA 1380 AND LONGERON 36L, DAMAGE EXCEEDED LIMITATIONS IAW DC8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC8 SRM 51-1-8, FABRICATED PART AND INSTALLED IAW DC8 SRM 51-1-8 & 53-2-2 FIG 11. CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM.