What was found
DURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE TO BATH TUB FITTING AT STA 350 BETWEEN LONGERONS 31L TO 32L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED NEW PART AND INSTALLED IAW DC-8 SRM 51-1-20D. (CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM).