What was found
DURING A MAINTENANCE VISIT FOUND 2 CRACKS AT THE VERTICAL STABILIZER L/E RIB NR13 FROM TOP (1 LT AND 1 R/H) ON END OF RIBS, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. STOP DRILLED, REPAIRED AND INSTALLED IAW DC-8 SRM 55-2-0 FIG 2