What was found
DURING A MAINTENANCE VISIT FOUND A CRACK AT THE LT O/B CENTER L/E UPPER RIB AT FASTENER END AT STA'S XFS 635.000, 641.250, 653.750, 660.000 AND 672.5, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. STOP DRILLED, REPAIRED AND INSTALLED IAW DC-8 SRM 57-3-3 FIG 6.