What was found
DURING A MAINTENANCE VISIT, FOUND A CRACK TO THE FLOORBEAM ATTACH FITTING AT STA 759 RT, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED AND INSTALLED NEW ATTACH FITTING IAW DC-8 SRM, 51-3-0 AND 51-1-20D.