What was found
DURING A MAINTENANCE VISIT, FOUND A CRACK ON AFT FRAME AFT PRESSURE BULKHEAD FRAME Z + 18 X + 2 TO -2 TOP ANGLE OF FRAME, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. STOP DRILLED CRACK, FABRICATED AND INSTALLED REPAIR ANGLE IAW DC-8 SRM 53-2-5, FIG 26.