What was found
DURING A MAINTENANCE VISIT, FOUND CORROSION DAMAGE AND POSSIBLE CRACK ON THE ATTACH FITTING AT STA 940 AND L24R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. RECEIVED NEW ATTACH FITTING AND INSTALLED IAW DC-8 SRM 53-2-0 AND 51-1-20D.