What was found
DURING A MAINTENANCE VISIT FOUND A CRACK TO THE L/H L/E TOP T/E FORMER AT STA XFS 347.750, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 57-2-0 AND 51-1-4.