What was found
DURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE R/H W/W LONGERON VERTICAL FITTING AT STA 940 AND L24R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-4. (CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM).