What was found
DURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE 9G PAN AT STA 55 AND RBL -48, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-3-3 AND 53-2-0.