What was found
DURING A MAINTENANCE VISIT FOUND CORROSION TO L/H INTERNAL DOUBLER AT STA.8-70 AND L30L-L34R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 53-1-0, 51-1-20D, 51-1-21 AND DWG#5613862. (CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM).