What was found
KDAY - FLT 27 - DURING CLIMB-OUT, NUMEROUS WARNING LIGHTS AND INDICATORS FOR NR 2 ENG CAME ON. GEN DRIVE OIL LIGHT, NR 2 START VLV OPEN LIGHT, GEN FAIL LIGHT, GEN UNPARALLED LIGHT, ENG OIL PRESS FRONT AND BACK AND CB'S OPENED ALL PERTAINING TO NR 2 ENG, OIL PRESS AND TEMP AND INDICATORS WENT OFF SCALE HIGH THEN LOW. SHUTDOWN ENG NR 2 AT 0443Z, ENGINE OIL PRESS AND TEMP GAUGES AND LIGHTS WERE FAILED AND THERE WAS NO WAY TO MONITOR ENG. FOUND DUCT CLAMP MISSING FROM PNEU DUCT, AND NUMEROUS WIRING HARNESSES MELTED. A/C PREPARED FOR ONE ENG INOP FERRY PERMIT. R/R ALL ENG PYLON WIRING PLUGS AND CLAMPS IAW DC8 MM 20-50-1. R/R ENG WIRING HARNESS IAW DC8 MM 70-40-1. ALL SYS OPS CHK GOOD ON ENG RUNUP. (M)