SDR RRXA96040

Service difficulty report · Duct Clamp · Doug DC863

Difficulty date
July 16, 1996
Submitted
March 26, 2000
Operation
Air carrier
Aircraft
N950R
Make and model
Doug DC863
Aircraft serial
45903
Part
Duct Clamp
Condition
Missing
Location
Nr 2 Engine
Stage of operation
CL
Nature of condition
J
Precautionary procedure
E

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

KDAY - FLT 27 - DURING CLIMB-OUT, NUMEROUS WARNING LIGHTS AND INDICATORS FOR NR 2 ENG CAME ON. GEN DRIVE OIL LIGHT, NR 2 START VLV OPEN LIGHT, GEN FAIL LIGHT, GEN UNPARALLED LIGHT, ENG OIL PRESS FRONT AND BACK AND CB'S OPENED ALL PERTAINING TO NR 2 ENG, OIL PRESS AND TEMP AND INDICATORS WENT OFF SCALE HIGH THEN LOW. SHUTDOWN ENG NR 2 AT 0443Z, ENGINE OIL PRESS AND TEMP GAUGES AND LIGHTS WERE FAILED AND THERE WAS NO WAY TO MONITOR ENG. FOUND DUCT CLAMP MISSING FROM PNEU DUCT, AND NUMEROUS WIRING HARNESSES MELTED. A/C PREPARED FOR ONE ENG INOP FERRY PERMIT. R/R ALL ENG PYLON WIRING PLUGS AND CLAMPS IAW DC8 MM 20-50-1. R/R ENG WIRING HARNESS IAW DC8 MM 70-40-1. ALL SYS OPS CHK GOOD ON ENG RUNUP. (M)

More about the Doug DC-8-63