DURING A MAINTENANCE VISIT, FOUND TOP PLATING OF LT LEADING EDGE CRACKED, AT XW=257.5. REMOVED DAMAGED AREA 0.85, FABRICATED AND INSTALLED 1 FILLER AND 2 DOUBLERS IAW DER APPROVED COTNEY ENGINEERING SKETCH C44-R44.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING A MAINTENANCE VISIT, FOUND TOP PLATING OF LT LEADING EDGE CRACKED, AT XW=257.5. REMOVED DAMAGED AREA 0.85, FABRICATED AND INSTALLED 1 FILLER AND 2 DOUBLERS IAW DER APPROVED COTNEY ENGINEERING SKETCH C44-R44.