What was found
DURING A MAINTENANCE VISIT FOUND CORROSION, FUSELAGE, FWD PIT FRAME ATTACH ANGLE AT STA 160, LONGERON 31 RIGHT. DAMAGE EXCEEDED LIMITS IAW DC-8 SRM. REMOVED DAMAGED, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED ANGLE IAW DC8 SRM 51-2-0 FIG 50 AND 51-1-21. (CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM).