What was found
DURING A MAINTENANCE VISIT FOUND CORROSION, FUSELAGE, BULKHEAD, LMLG W/W TOP PRESSURE DECK AT OUTBOARD EDGE, STA 960, BL 60 LEFT, PRIMARY STRUCTURE. DAMAGE EXCEEDED LIMITS IAW DC-8 SRM. REMOVED DAMAGED, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED FINGER DOUBLER IAW DAC DWG NR SRO 8530026. (CORROSION DAMAGE RECORDED IN EWA CORROSION PROGRAM).