What was found
AT (B) CHECK FOUND. MAIN CARGO DOOR AFT HINGE WITH 2 CRACKED LOBES ON THE AFT PART OF THE AIRFRAME HINGE. DRILLED, TREATED, PRIMED AND INSTALLED NEW HINGE SECTION ON MAIN CARGO DOOR.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT (B) CHECK FOUND. MAIN CARGO DOOR AFT HINGE WITH 2 CRACKED LOBES ON THE AFT PART OF THE AIRFRAME HINGE. DRILLED, TREATED, PRIMED AND INSTALLED NEW HINGE SECTION ON MAIN CARGO DOOR.