What was found
L/H FUSELAGE FROM STA 663 TO AFT PRESSURE BULKHEAD HAS NOTEABLE CORROSION ALONG LAPSEAM AS MARKED. ACCOMPLISHED EA 737-5360-72-B0508 IR ON L/H FUSELAGE AT AREA 1 STA 727A 5-14L, AREA2 STA 727D 5-14L, AREA 3 STA 727F TO STA 727G 5-14L, AREA 4 STA 747 TO STA 767 5-14L, FOUND TO BE ACCEPTABLE AS PERMANENT CATEGORY A. THIS REPAIR IS CONSIDERED AS MOINOR REPAIR.