What was found
DURING HEAVY MAINTENANCE, FOUND CORROSION ON LEFT HAND CABIN FLOOR STRUCTURE, APPROXIMATELY STATION 836 AND 18 INCHES LEFT OF THE C-LIFT. REMOVED CORROSION, FABRICATED AND INSTALLED A REPAIR PER ENGINEERING ORDER INSTRUCTIONS AND SRM CHAPTER 51.