What was found
DURING HEAVY CHECK, THE REMOVAL OF A FLOOR PANEL TO FACILITATE MAINTENANCE REVEALED A CRACKED FLOOR SUPPORT UNDER THE PATIO FLOOR PANEL. FABRICATION OF ONE DOUBLER, 2024 T3 .040 AND ONE FILLER 2029 T3 .032 PER SRM 53-00-01 AND TREATED PER SRM 51-21-01 AND INSTALLED PER SRM 51-31-01. THE REPAIR PER SRM 53-00-01.