Service difficulty report · Structure · Emb EMB135LR

Difficulty date
January 29, 2001
Submitted
May 21, 2001
Operation
Air carrier
Aircraft
N732DH
Make and model
Emb EMB135LR
Aircraft serial
145358
Part
Structure
Condition
Leaking
Location
Fuselage
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LGA - FLT 4559 - DURING CLIMB, CREW REPORTED A PRESSURIZATION LEAK IN THE FORWARD NOSE GEAR AREA. CABIN PRESSURE STARTED TO CLIMB TO 6 PSI AT 5000 FEET. MAINTENANCE COULD NOT DUPLICATE DISCREPANCY. OPERATIONAL CHECK IAW EMB MM 21-31-00 WAS GOOD AND AIRCRAFT WAS RETURNED TO SERVICE. (M)

More about the Emb EMB-135LR