What was found
ABI - DURING AN MBV INSPECTION AND REPAIR OF HAIL DAMAGE. ON PREVIOUS STATEMENT ID 69 DENT BETWEEN STATION 487 AND 512 AND BETWEEN SL 1601 AND 1602. PERFORMED A CUT OUT OF THE DAMAGED AREA. FABRICATED A REPAIR DOUBLER FOR REPAIR. REPAIR DONE IAW SAAB REPAIR STATEMENT 340SDS006572, PARA 1, 3, 8. (M)