What was found
ABI - DURING AN IMBV MAINTENANCE, FOUND CORROSION ON GALLEY CENTER BEAM. REMOVED CORRODED GALLEY CENTER BEAM. INSTALLED NEW BEAM IAW EMB 145 (SRM 145/1142, CHAP 51 REV 18) 51-40-02, GST 1128/02, AND STANDARD SRM PRACTICES. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ABI - DURING AN IMBV MAINTENANCE, FOUND CORROSION ON GALLEY CENTER BEAM. REMOVED CORRODED GALLEY CENTER BEAM. INSTALLED NEW BEAM IAW EMB 145 (SRM 145/1142, CHAP 51 REV 18) 51-40-02, GST 1128/02, AND STANDARD SRM PRACTICES. (M)