What was found
ABI - DURING INSPECTION, FOUND CORROSION ON PREVIOUS REPAIR AFT DIGITAL. REMOVED PREVIOUS REPAIR. FABRICATED AND INSTALLED NEW DOUBLER IAW EMB 145 SST-249/00 AND STANDARD SRM PRACTICES. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ABI - DURING INSPECTION, FOUND CORROSION ON PREVIOUS REPAIR AFT DIGITAL. REMOVED PREVIOUS REPAIR. FABRICATED AND INSTALLED NEW DOUBLER IAW EMB 145 SST-249/00 AND STANDARD SRM PRACTICES. (M)