What was found
ABI - DURING INSPECTION FOUND CORROSION ON PREVIOUS REPAIR FORWARD DIGITAL. REMOVED PREVIOUS REPAIR. FABRICATED AND INSTALLED DOUBLER, IAW EMB SST-2906/00, AND STANDARD SRM PRACTICES. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ABI - DURING INSPECTION FOUND CORROSION ON PREVIOUS REPAIR FORWARD DIGITAL. REMOVED PREVIOUS REPAIR. FABRICATED AND INSTALLED DOUBLER, IAW EMB SST-2906/00, AND STANDARD SRM PRACTICES. (M)