What was found
ABI - DURING AN IMBV INSPECTION, FOUND LOWER PORTION OF RIGHT FRAME 72 DENTED. RECONTOURED DENT. PERFORMED NDT, NO DEFECTS. FABRICATED TWO L SHAPE DOUBLERS. INSTALLED IAW EMB GST-1776/02, ITEM NR 3 GST-1784/02, AND STANDARD SRM PRACTICES. (M)